Res. Agr. Eng., 2009, 55(1):35-38 | DOI: 10.17221/505-RAE

Assessment of the current theory for projecting cableway routes in terms of the risk level in overloading

V. Štollmann, Š. Ilčík

The article deals with the safety of labour and of technical equipment in timber skidding using forest cableways. It analyses the applicability of the current theory used for designing cableway routes from the point of view of safety in terms of an excessive overload. The analysis, which was carried out using situational models, has shown that the skyline will break as a result of several fold excess of the safe working load. The value of the buckling load is in such case at least 3.5 times higher than that of the safe working load. Our results have confirmed the applicability of the theory currently used in designing cableway routes.

Keywords: forest cableways; safety of technical devices; labour safety

Published: March 31, 2009  Show citation

ACS AIP APA ASA Harvard Chicago Chicago Notes IEEE ISO690 MLA NLM Turabian Vancouver
Štollmann V, Ilčík Š. Assessment of the current theory for projecting cableway routes in terms of the risk level in overloading. Res. Agr. Eng. 2009;55(1):35-38. doi: 10.17221/505-RAE.
Download citation

References

  1. Dukeľskij A.I. (1966): Podvesnyje kanatnyje dorogi i kabeľnyje krany. Mašinostrojenie, Moskva.
  2. Roško P. (1984): The Theoretical Basis of Wood Skidding and Accessing of difficult Terrain. Veda, Bratislava. (in Slovak)

This is an open access article distributed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International (CC BY NC 4.0), which permits non-comercial use, distribution, and reproduction in any medium, provided the original publication is properly cited. No use, distribution or reproduction is permitted which does not comply with these terms.